New Building Support

Make sure you get what you ordered

There are several critical steps in manufacturing, tuning and testing a marine diesel engine. If the production quality is not optimal, it can cause trouble during operation or lead to excessive fuel oil consumption. None of which you want to hear. Tekomar is best contracted in an early stage to ensure maximum benefit to you.


Important alignment works verified

Bed-plate levelling and piston centring are crucial alignment works during assembly in the assembly shop. Shaft alignment is equally important during assembly in the ship.

With our experience we are able to ensure that the vessel’s propulsion system is optimised according to the contract and that it meets the characteristics of the shop tests.

Contact us to get to know, how you can benefit from our experience or have a look at our references.


Optimum fuel oil consumption from day one, plausibility check

With Tekomar’s know-how and experience in engine tuning, you can be sure the engine is tuned for optimised fuel consumption. 

Therefore, the collaboration with our engineers gives you the benefit of a second impartial opinion with no interest in selling you apples as oranges.

Contact us to get to know, how you can benefit from our experience or have a look at our references.


Perfectly aligned and adjusted propulsion system at ship delivery

With optimum settings your engine may be able to perform at the best level from the very first moment. You also protect your investment. Not only up to the start, but also for the future years of the ship’s service.

Contact us to get to know, how you can benefit from our experience or have a look at our references.


How can you benefit from Tekomar’s New Building Support?

Our specialists’ key areas are:

  • Specifications during project initiation
  • Bedplate levelling in the workshop, including crankshaft deflection
  • Piston centring
  • System oil flushing prior to start
  • Running-in
  • Engine tuning & T/C matching
  • Confirmation and shop test
  • Overhaul inspection
  • Shaft alignment on vessel
  • Sea trial of vessel

The support and accuracy of Tekomar has been a key fact to the successful new building.
Thomas David, New Building Director, JT Essberger

Offer & contact

We are here to assist you

We support you during the entire new building project and escalate issues if contract details are not met by the builders.